REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · MAGNESITE

Bandalup Magnesite

OPERATOR · Ashbridge Holdings Pty Ltd / Butler MacDonald Butler (50/50 JV) TYPE · Open Cut / Surface Mining (Magnesite) REGION · Goldfields-Esperance
01

Operation Details

Operator
Ashbridge Holdings Pty Ltd / Butler MacDonald Butler (50/50 JV)
Commodity
Magnesite
Type
Open Cut / Surface Mining (Magnesite)
Region
Goldfields-Esperance
District
Phillips River M.F.
Latitude
-33.607597
Longitude
120.363449
02

Project Logistics & B2B Overview

Geographic Location and Topography

Bandalup Magnesite N2 is situated within the Phillips River Mineral Field, Goldfields-Esperance Region, Western Australia — a semi-arid corridor characterised by extreme diurnal temperature swings exceeding 40°C in summer. The terrain presents lateritic surface profiles over shallow magnesite horizons, demanding rigorous thermal management protocols for all heavy mobile equipment deployed on-site. Dust suppression and heat-load mitigation are non-negotiable operational prerequisites in this environment.

B2B Lifecycle and Operations

The project operates under a 50/50 joint venture structure between Ashbridge Holdings Pty Ltd and Butler MacDonald Butler, with MINEDEX classifying the Bandalup N2 East deposit as undeveloped as of the latest available data. The acute absence of local mechanical workshops within the Phillips River corridor creates critical exposure to unplanned downtime. B2B vendors supplying MARC contracts, mobile field service units, and rapid-response parts logistics hold a decisive competitive advantage in this supply chain.

Engineering and Extraction Infrastructure

Magnesite extraction at this deposit class typically demands a primary crushing and grinding circuit configured for high-purity MgCO₃ liberation, followed by calcination or beneficiation stages. Key engineering requirements include:

  • Primary jaw/cone crushing for run-of-mine magnesite feed preparation
  • High-temperature rotary kiln integration for deadburned or caustic-calcined MgO production
  • Flotation or dense-media separation for silica and dolomite gangue rejection
  • Reagent dosing systems with precise pH and temperature control

ESG, Value Chain and Sustainability

Operating within Goldfields-Esperance mandates strict adherence to Aboriginal Heritage Act 1972 (WA) obligations, with Section 18 consent processes critical to any ground-disturbance programme. B2B procurement strategies must prioritise:

  • Engagement with Registered Aboriginal Parties (RAPs) for heritage surveys and cultural monitoring
  • Preferred supplier agreements with Aboriginal-owned enterprises for civil, catering, and logistics services
  • Alignment with WA Government's Aboriginal Procurement Policy targets
  • Carbon footprint reporting for calcination-intensive magnesite processing
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Bandalup Magnesite.
Get listed