REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Beta Hunt Gold Mine

OPERATOR · Westgold Resources Limited (formerly operated under Karora Resources; mineral tenure held by Gold Fields Limited) TYPE · Underground Hard Rock Mining (Gold & Nickel by-product) — Sub-level Open Stoping with paste fill REGION · Goldfields-Esperance
01

Operation Details

Operator
Westgold Resources Limited (formerly operated under Karora Resources; mineral tenure held by Gold Fields Limited)
Commodity
Gold
Type
Underground Hard Rock Mining (Gold & Nickel by-product) — Sub-level Open Stoping with paste fill
Region
Goldfields-Esperance
District
Coolgardie
Latitude
-31.242525
Longitude
121.689952
02

Compliance & B2B Logistics

HSE & Site Induction

Westgold Resources HSE Framework — compliant with WA Mines Safety and Inspection Act 1994; site-specific underground fatigue management and ground control management plans (GCMP) enforced

Access Logistics & DIDO

FIFO rotational rosters ex-Perth (PER) via Kalgoorlie-Boulder Airport (KGI); site located ~25 km south of Kambalda on the Goldfields Highway; DIDO access from Kalgoorlie (~60 km radius)

Camp Facilities & Telecom

Permanent on-site accommodation village operational; Telstra network coverage (4G/LTE) primary carrier for Goldfields corridor; camp supports FIFO/DIDO workforce with full catering and welfare facilities
03

Project Logistics & B2B Overview

Geographic Location and Topography

Beta Hunt is situated within the Kambalda Dome, approximately 25 km south of Kambalda and 600 km east of Perth in the Goldfields-Esperance region of Western Australia. The terrain is characterised by flat, semi-arid lateritic plains dominated by red fine-grained dust (red dirt), imposing severe abrasion and particulate ingestion challenges on all surface plant, mobile equipment, and HVAC filtration systems. Vendors supplying filters, seals, and wear-resistant components must engineer to IP66+ standards as a baseline requirement.

B2B Lifecycle and Operational Status

Beta Hunt is an actively operating underground mine under Westgold Resources Limited following its August 2024 merger with Karora Resources. The mineral tenure is subleased from Gold Fields Limited. The operation runs continuous FIFO rotational rosters (typically 8/6 and 14/7 schedules) flown ex-Perth into Kalgoorlie-Boulder Airport, with DIDO supplementing local Goldfields workforce. Camp logistics, catering, medical, and telecommunications infrastructure are mission-critical B2B procurement categories for uninterrupted operational continuity.

Engineering and Extraction Infrastructure

Beta Hunt employs sub-level open stoping with cemented paste fill as the primary underground mining method, targeting high-grade gold lodes (including the historically significant Father's Day Vein). Run-of-mine ore is processed through a primary crushing and ball mill grinding circuit, feeding a gravity-gold recovery circuit complemented by a CIL (Carbon-in-Leach) processing train. The circuit demands continuous supply of:

  • High-chrome grinding media and mill liners rated for abrasive komatiite-hosted ore
  • Activated carbon, cyanide reagents, and pH-control lime dosing systems
  • Underground paste fill reticulation pipework and high-pressure pumping assemblies
  • Ventilation-on-demand (VOD) systems for diesel particulate management

ESG, Value Chain and Sustainability

Westgold Resources has committed to a decarbonisation roadmap aligned with WA Government emissions reduction targets. At Beta Hunt, key ESG initiatives include:

  • Transition to battery electric vehicles (BEV) for underground loaders and utility vehicles to reduce diesel particulate matter (DPM) exposure
  • Evaluation of hybrid solar-diesel microgrids to reduce Scope 2 emissions at surface infrastructure
  • Water recycling circuits within the processing plant to minimise freshwater draw in a water-stressed Goldfields environment
  • Progressive rehabilitation and tailings management compliant with ICMM Tailings Standard requirements
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Beta Hunt Gold Mine.
Get listed