REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Big Bell Gold Mine

OPERATOR · Westgold Resources Limited (operated by Big Bell Gold Operations Pty Ltd) TYPE · Underground Hard Rock Gold Mining REGION · Mid-West
01

Operation Details

Operator
Westgold Resources Limited (operated by Big Bell Gold Operations Pty Ltd)
Commodity
Gold
Type
Underground Hard Rock Gold Mining
Region
Mid-West
District
Cue
Latitude
-27.318646
Longitude
117.655367
02

Compliance & B2B Logistics

Access Logistics & DIDO

FIFO rotations via Meekatharra Airport or Perth (PER) — regional road access via Great Northern Highway (NHwy 95), Cue district, Mid-West WA

Camp Facilities & Telecom

Westgold-managed on-site accommodation village, Cue Operations; Telstra network coverage (regional/limited 4G)
03

Project Logistics & B2B Overview

Geographic Location and Topography

Big Bell is situated within the Murchison Goldfield, approximately 750 km north of Perth near Cue, Mid-West Western Australia. The terrain is characterised by flat to gently undulating semi-arid scrubland overlying Archaean greenstone belts. This low-relief topography simplifies bulk earthworks and haul road construction, yet the extreme remoteness and seasonal heat cycles impose critical constraints on heavy equipment mobilisation, civil grading schedules, and dust suppression programmes across all surface infrastructure corridors.

B2B Lifecycle and Operational Framework

Big Bell operates as a core asset within Westgold's Cue Gold Operations portfolio, currently in active production phase. Workforce deployment relies on structured FIFO roster cycles (typically 8:6 or 14:7), with personnel rotated through Meekatharra or Perth. Key B2B supply categories include:

  • Camp catering and facilities management
  • Explosives and ground support consumables
  • Mobile plant maintenance and tyre services
  • Fuel logistics and bulk reagent supply
  • Medical, safety and PPE provisioning

Engineering and Extraction Infrastructure

The operation employs underground longhole open stoping methods targeting high-grade gold lodes within Archaean shear zones. Processing infrastructure demands include:

  • Primary crushing and SAG/ball mill grinding circuits
  • Gravity concentration and CIL (Carbon-in-Leach) gold recovery
  • Cyanide detoxification systems (INCO SO₂/Air process)
  • High-precision reagent dosing (NaCN, lime, flocculants)
  • Paste fill or hydraulic backfill reticulation underground

Physico-chemical control of leach pH (10.5–11.0) and dissolved oxygen is critical to gold recovery efficiency.

ESG, Value Chain and Sustainability

Westgold applies proactive tailings storage facility (TSF) management aligned with the Global Industry Standard on Tailings Management (GISTM). ESG commitments at Cue Operations encompass:

  • Engineered TSF liner systems and leachate monitoring bores
  • Progressive land rehabilitation and native vegetation restoration
  • Water recycling from TSF return-water systems (>70% reuse targets)
  • Greenhouse gas reporting under NGER Act obligations
  • Aboriginal heritage clearance protocols pre-disturbance
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Big Bell Gold Mine.
Get listed