REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GYPSUM

Cowcowing Gypsum Mine

OPERATOR · Gypsum Industries / Gypsum Supplies / Lake Hillman Mining Pty Ltd TYPE · Open-cut lacustrine gypsum extraction (surface scraping / shallow pit mining from playa lake deposit) REGION · Wheatbelt
01

Operation Details

Operator
Gypsum Industries / Gypsum Supplies / Lake Hillman Mining Pty Ltd
Commodity
Gypsum
Type
Open-cut lacustrine gypsum extraction (surface scraping / shallow pit mining from playa lake deposit)
Region
Wheatbelt
District
South West M.F.
Latitude
-31.014282
Longitude
117.347971
02

Compliance & B2B Logistics

Access Logistics & DIDO

Road haulage via Great Eastern Highway corridor; nearest rail siding Wyalkatchem / Kalannie; approx. 250–300 km northeast of Perth CBD
03

Project Logistics & B2B Overview

Geographic Location and Topography

Lake Cowcowing is a playa lake system situated in the Wheatbelt region of Western Australia, approximately 250–300 km northeast of Perth. The remote inland location directly impacts supply chain lead times for consumables, mechanical parts, and specialist labour. Flat, semi-arid terrain with seasonal lake flooding governs extraction windows. Operators must plan procurement cycles well in advance to offset the logistical penalty imposed by distance from metropolitan distribution hubs.

B2B Operational Cycle and Operators

  • Gypsum Industries — active extraction at Lake Cowcowing for over 30 years; established long-cycle operation.
  • Gypsum Supplies (Daniel Nixon) — recently commissioned a new pit at the same lake system, signalling expanded production capacity.
  • Lake Hillman Mining Pty Ltd — co-operator on the broader Lake Cowcowing North–West Dukin / Lake Hillman project corridor.

Multi-operator coexistence on a single lacustrine system creates competitive procurement dynamics, increasing local demand for shared mechanical workshop services and haulage contractors.

Extraction Engineering and Infrastructure

Lacustrine gypsum extraction relies on shallow mechanical scraping and front-end loader recovery rather than conventional drill-and-blast. Primary sizing is achieved via mobile crushers or rotary breakers on-site. No flotation circuit is required; however, moisture management and drying/screening infrastructure are critical to meeting agricultural and industrial gypsum product specifications. Equipment operating in saline, abrasive lake-bed conditions demands accelerated maintenance intervals and access to local mechanical repair capability to prevent costly unplanned downtime.

ESG, Value Chain and Sustainability

  • Heritage compliance under the WA Aboriginal Heritage Act is mandatory prior to any new pit development within the lake system.
  • Engagement with Noongar-aligned enterprises for earthworks, rehabilitation, and environmental monitoring represents a growing B2B procurement priority.
  • Gypsum's role as a low-carbon soil amendment positions both operators favourably within agricultural ESG supply chains.
  • Progressive rehabilitation of extracted lake cells is expected under DMP conditions of approval.
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Cowcowing Gypsum Mine.
Get listed