REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Gabbro

REGION · Goldfields-Esperance
01

Operation Details

Commodity
Gold
Region
Goldfields-Esperance
District
Kunanalling
Latitude
-30.701356
Longitude
121.223612
02

Compliance & B2B Logistics

Access Logistics & DIDO

DIDO via Kalgoorlie-Boulder (approx. 50–70 km northwest); access via Great Eastern Highway and unsealed station tracks through Kunanalling pastoral zone.
03

Project Logistics & B2B Overview

Geographic Location and Topography

Gabbro Hill is situated within the Kunanalling district, Eastern Goldfields of Western Australia, embedded in the semi-arid to arid Yilgarn Craton landscape. Terrain is characterised by low-relief lateritic plains, sparse mulga scrub, and calcrete-dominated soils. Extreme aridity — annual rainfall below 280 mm — makes surface water negligible. Operational water supply depends entirely on licensed borefield extraction or haulage from Kalgoorlie-Boulder infrastructure, making water management a primary engineering constraint for any contractor or vendor entering site.

B2B Operational Cycle and Site Services

As an operating gold asset in a remote Goldfields corridor, Gabbro Hill generates continuous demand for DIDO mechanical and electrical contractors. The nearest heavy-service hub is Kalgoorlie-Boulder (~50–70 km). Critical B2B requirements include:

  • Mobile workshop units for in-situ equipment repair to minimise downtime
  • Drill consumables and blast supply logistics
  • Fuel and lubricant delivery under scheduled rotations
  • Tyre management services for light and heavy mobile fleet
  • Reagent supply chains for processing operations

Extraction Engineering and Processing Infrastructure

Gold mineralisation at Gabbro Hill is hosted within mafic-ultramafic intrusive sequences typical of Yilgarn greenstone belts. Processing likely involves a primary crushing and SAG/ball mill grinding circuit, followed by gravity concentration and carbon-in-leach (CIL) cyanidation. Key engineering demands include:

  • Precise grind size control (P80 targeting) for optimal gold liberation
  • Cyanide dosing and pH management (lime addition circuits)
  • Gravity concentrator maintenance (Knelson/Falcon units)
  • Elution and electrowinning cell integrity

ESG, Tailings Management and Sustainability

Operating mines in WA's Goldfields are subject to DMIRS regulatory oversight and mandatory Mine Closure Plan obligations. Tailings storage facilities (TSFs) must comply with ANCOLD guidelines, requiring engineered liner systems, leachate monitoring, and progressive rehabilitation. ESG priorities at remote Goldfields operations include:

  • Tailings facility geotechnical stability audits (annual minimum)
  • Cyanide management per ICMC code requirements
  • Native vegetation offset and topsoil stockpile management
  • Groundwater monitoring bore networks around TSF footprint
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Gabbro.
Get listed