GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)

Jalbarragup Walsall

Stage: Operating
Last Updated: May 30, 2026

Operation Details

CommodityConstruction Materials
RegionSouth West
DistrictSouth West M.F.
Latitude-33.809487
Longitude115.394111

Project Logistics & B2B Overview

Geographic Location and Topography

Jalbarragup Walsall is situated within the South West Mining Field of Western Australia, a region characterized by undulating lateritic terrain, dense karri and marri woodland, and a high-rainfall Mediterranean climate. Annual precipitation regularly exceeds 800 mm, generating intense seasonal mud loading on unsealed haul roads and access tracks. Operators must implement engineered road base compaction, geotextile reinforcement, and active drainage culverts to maintain truck payload efficiency and prevent axle-load failures during winter extraction cycles.

B2B Lifecycle and Operations

The site operates under an active production status, supplying construction materials — likely crushed aggregate, road base, or sand — to regional civil and infrastructure markets. Operational continuity demands:

  • Diesel-intensive mobile fleet: excavators, loaders, and articulated dump trucks running continuous shifts
  • Dependency on grid-tied or generator-backed power substations for crushing and screening plant operation
  • Procurement cycles aligned with WA civil construction seasonal demand peaks (Q1–Q2)

Engineering and Extraction Infrastructure

Construction material quarries in this geological zone typically deploy a primary jaw crushing circuit followed by secondary cone crushing and vibrating screen classification. Key engineering requirements include:

  • Aggregate gradation control to meet Main Roads WA specifications
  • Dust suppression systems (water cannons, chemical binders) on crushing decks
  • Stockpile management with load-out conveyors for truck dispatch efficiency
  • Wear-part replacement cycles critical for crusher liners and screen media

ESG, Value Chain and Sustainability

South West WA quarry operators face increasing pressure to align with ESG decarbonisation targets under state and federal frameworks. Emerging initiatives applicable to this site include:

  • Deployment of solar-hybrid power systems to offset diesel generator consumption
  • Transition pathways toward electric or hydrogen light vehicles for site personnel
  • Rehabilitation bonding and progressive land restoration per DMP conditions
  • Biodiversity offset programs consistent with SW WA Floristic Region obligations
B2B SUPPLY CHAIN

EXPAND YOUR REACH TO
JALBARRAGUP WALSALL

Connect directly with procurement managers in the South West region.
Get your company listed and expand your operational footprint.

Get Listed for $65/mo