REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GYPSUM

Lake Gulson

OPERATOR · G A & J E KIDMAN TYPE · Open Cut / Surface Mining (Gypsum) REGION · Wheatbelt
01

Operation Details

Operator
G A & J E KIDMAN
Commodity
Gypsum
Type
Open Cut / Surface Mining (Gypsum)
Region
Wheatbelt
District
South West M.F.
Latitude
-32.819747
Longitude
119.466963
02

Compliance & B2B Logistics

Access Logistics & DIDO

Road haulage via Great Eastern Highway corridor; DIDO operations from Merredin or Kellerberrin regional hubs
03

Project Logistics & B2B Overview

Geographic Location and Topography

Lake Gulson is situated within the South West Mineral Field, Wheatbelt Region, Western Australia — approximately 250–300 km east of Perth. The site occupies a playa lake system, characteristic of the semi-arid Wheatbelt, where evaporitic gypsum deposits accumulate in shallow lacustrine basins. Flat terrain facilitates surface extraction but amplifies supply chain vulnerability. Distance from Perth's industrial corridors directly increases lead times for consumables, mechanical parts, and specialist contractor mobilisation, making regional logistics planning a critical operational variable.

B2B Operational Cycle and Commercial Activity

Operating under sole ownership by G A & J E KIDMAN, Lake Gulson functions as a privately held, single-commodity gypsum extraction operation. The B2B procurement cycle is characterised by lean contractor engagement typical of small-to-mid-scale Wheatbelt mining. Key operational dependencies include:

  • Local mechanical workshops in Merredin or Narembeen to minimise equipment downtime
  • Tyre and conveyor belt supply contracts with regional distributors
  • Bulk haulage operators for gypsum dispatch to agricultural and construction markets
  • Fuel and lubricant supply via road tanker on scheduled runs

Extraction Engineering and Infrastructure

Gypsum extraction at Lake Gulson employs shallow open-cut methodology, with mechanical scrapers and front-end loaders operating across the lake bed stratigraphy. Unlike hard-rock operations, no primary crushing circuit or flotation plant is required; however, particle size classification and moisture control are critical to product specification compliance. Processing infrastructure typically includes:

  • Rotary or static screening decks for granulometric separation
  • Stockpile management for moisture equilibration
  • Dust suppression systems across haul roads and processing pads
  • Weighbridge and load-out facilities for bulk dispatch

ESG, Value Chain and Sustainability

As a playa lake operation, Lake Gulson carries specific rehabilitation obligations under Western Australian Mining Act provisions. Gypsum extraction from lacustrine systems requires proactive management of:

  • Tailings and overburden segregation to preserve lake hydrology
  • Progressive landform rehabilitation aligned with DMP-approved closure plans
  • Dust and salinity control to protect adjacent agricultural land
  • Minimal water consumption footprint — a key ESG advantage of evaporitic mining

The low-carbon extraction profile of surface gypsum mining positions Lake Gulson favourably within sustainable supply chains for agricultural amendment and low-emission construction materials.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Lake Gulson.
Get listed