REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GYPSUM

Lake Lockhart Gypsum

TYPE · Open Cut / Quarry (Gypsum) REGION · Wheatbelt
01

Operation Details

Commodity
Gypsum
Type
Open Cut / Quarry (Gypsum)
Region
Wheatbelt
District
South West M.F.
Latitude
-33.269943
Longitude
119.048948
02

Project Logistics & B2B Overview

Geographic Location and Topography

Lake Lockhart is situated within the South West Mineral Field of Western Australia's Wheatbelt region, approximately 300–400 km southeast of Perth. The site occupies a playa lake system characteristic of the region — flat, semi-arid terrain with seasonal salinity fluctuations. Distance from Perth directly impacts supply chain lead times, increasing logistics costs for consumables, mechanical parts, and fuel replenishment across unsealed or low-grade regional road networks.

B2B Operational Cycle and Site Activity

As an operating gypsum quarry, Lake Lockhart relies on diesel-powered mobile fleet — excavators, front-end loaders, and haul trucks — consuming significant fuel volumes daily. Without confirmed grid connection, on-site diesel generation sets likely support auxiliary power for processing, lighting, and communications. Procurement cycles for wear parts, tyres, and bulk fuel delivery are critical operational dependencies for any B2B vendor targeting this site.

  • Bulk diesel supply and on-site fuel storage management
  • Mobile plant maintenance and tyre supply contracts
  • Electrical switchgear and generator servicing
  • Dust suppression and water carting services

Extraction Engineering and Processing Infrastructure

Gypsum extraction at Lake Lockhart follows a shallow open-cut quarry methodology, given the sedimentary lacustrine deposit profile typical of Wheatbelt playa systems. Primary processing involves crushing and screening circuits to achieve product gradation for agricultural or industrial gypsum markets. Physico-chemical quality control — targeting CaSO₄·2H₂O purity thresholds — is critical for end-user compliance. Conveyor systems, vibrating screens, and stockpile management infrastructure represent key engineering asset categories on site.

  • Primary jaw or impact crushing stage
  • Vibrating screen classification circuits
  • Bulk stockpile and load-out infrastructure
  • Purity sampling and laboratory QC protocols

ESG, Value Chain and Sustainability

Gypsum operations in the Wheatbelt face growing pressure to align with Western Australia's ESG decarbonisation frameworks. Opportunities exist for solar hybrid power integration to offset diesel consumption at remote sites. The product itself carries an inherent circular economy value — agricultural gypsum improves soil structure and reduces synthetic fertiliser dependency, supporting downstream sustainability narratives. Vendors offering renewable energy microgrid solutions or low-emission mobile plant will find increasing receptivity at sites like Lake Lockhart.

  • Solar-diesel hybrid microgrid feasibility
  • Carbon footprint reporting for Scope 1 & 2 emissions
  • Agricultural gypsum as a sustainable soil amendment product
  • Electric or hybrid light vehicle fleet transition pathways
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Lake Lockhart Gypsum.
Get listed