REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · SALT

Lake MacLeod

OPERATOR · Leichhardt Industrials Group TYPE · Solar evaporation salt and gypsum harvesting REGION · Gascoyne
01

Operation Details

Operator
Leichhardt Industrials Group
Commodity
Salt
Type
Solar evaporation salt and gypsum harvesting
Region
Gascoyne
District
Gascoyne M.F.
Latitude
-24.446488
Longitude
113.551608
02

Project Logistics & B2B Overview

Geographic Location and Topography

Lake Macleod is a large ephemeral salt lake located approximately 70 km north of Carnarvon in Western Australia's Gascoyne region. The terrain is characterised by an extremely flat, low-lying playa surface — ideal for solar evaporation pond construction but presenting significant challenges for bulk earthworks, bund maintenance, and drainage control. The hyper-arid, wind-exposed environment accelerates evaporation rates while demanding precise civil grading to manage brine flow across vast pond networks.

B2B Lifecycle and Operations

Following Leichhardt Industrials Group's acquisition in December 2024 from the former Dampier Salt Limited joint venture (Rio Tinto 68.4%, Marubeni 21.5%, Sojitz 10.1%), the operation enters a new commercial cycle. B2B vendors must anticipate:

  • Re-tendering of maintenance and supply contracts under new ownership
  • Acute demand for local mechanical workshops to minimise costly unplanned downtime
  • Harvesting equipment servicing cycles aligned to seasonal production windows
  • Salt and gypsum export logistics via Port of Carnarvon

Engineering and Extraction Infrastructure

Salt harvesting at Lake Macleod relies on an extensive network of conveyor systems transferring bulk crystallised salt from harvest zones to stockpile and ship-loading facilities. Key engineering considerations include:

  • High-wear conveyor belt maintenance under abrasive saline conditions
  • Brine pump station integrity across multiple evaporation stages
  • Heavy mobile harvesting equipment (scrapers, haul trucks) operating on soft playa substrate
  • Gypsum separation and processing circuits requiring dedicated mechanical support

ESG, Value Chain and Sustainability

Operating within the Gascoyne region mandates rigorous Aboriginal Heritage compliance under the WA Aboriginal Heritage Act. B2B partners are expected to demonstrate:

  • Active engagement with Indigenous-owned enterprises for civil, catering, and environmental services
  • Heritage survey protocols prior to any ground disturbance or infrastructure expansion
  • Minimal freshwater consumption leveraging natural brine resources
  • Carbon footprint reporting aligned to new ownership ESG commitments post-2024 transition
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Lake MacLeod.
Get listed