REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GYPSUM

Lake Morris Gypsum

TYPE · Open Cut / Surface Mining (Gypsum) REGION · Wheatbelt
01

Operation Details

Commodity
Gypsum
Type
Open Cut / Surface Mining (Gypsum)
Region
Wheatbelt
District
South West M.F.
Latitude
-33.478252
Longitude
119.238987
02

Compliance & B2B Logistics

Access Logistics & DIDO

DIDO road access via Great Eastern Highway or Brand Highway corridors; estimated 200–350 km east of Perth CBD depending on exact sub-location within South West Wheatbelt MF zone.
03

Project Logistics & B2B Overview

Geographic Location and Topography

Lake Morris Gypsum is situated within the South West Mineral Field of Western Australia's Wheatbelt region, approximately 200–350 km east of Perth. The terrain is characterised by flat to gently undulating lacustrine plains typical of ancient playa lake systems — the primary geological host for evaporite gypsum deposits. Remoteness from Perth directly extends supply chain lead times for consumables, reagents, and mechanical components, demanding robust inventory buffering and pre-scheduled logistics windows.

B2B Lifecycle and Operational Status

The operation holds active Operating status, confirming ongoing extraction and commercial dispatch of gypsum product. No publicly registered operator or corporate contact has been identified through open-source intelligence. B2B vendors should anticipate:

  • DIDO rosters as the primary workforce mobilisation model given proximity to regional towns
  • Lean site crew structures typical of small-to-mid-scale gypsum quarries
  • Procurement cycles driven by a single or private owner-operator entity
  • Limited on-site camp infrastructure; accommodation likely sourced from nearest township

Extraction Engineering and Infrastructure

Gypsum extraction at lacustrine deposits typically employs shallow open-cut strip mining with minimal overburden removal. Key engineering considerations include:

  • Primary crushing via jaw or impact crusher circuits for size reduction to marketable fractions
  • Dry screening and classification replacing wet flotation — gypsum purity managed through selective mining and scalping screens
  • Dust suppression systems critical given arid Wheatbelt conditions
  • Haul road maintenance intensive during wet season due to clay-rich lake bed substrates
  • Load-out facilities for bulk road transport to Perth or regional cement/agricultural markets

ESG, Value Chain and Sustainability

Gypsum operations in the Wheatbelt carry a low-carbon extraction profile relative to hard-rock mining, given shallow dig depths and absence of energy-intensive comminution circuits. ESG-relevant factors include:

  • Gypsum's role as a circular economy input — recycled wallboard and agricultural soil amendment reducing virgin extraction pressure
  • Potential for solar-hybrid power given Wheatbelt's high solar irradiance (>5.5 kWh/m²/day)
  • Land rehabilitation obligations under WA DMP tenure conditions post-extraction
  • Water-neutral processing profile — dry beneficiation eliminates process water demand
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Lake Morris Gypsum.
Get listed