REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · LIMESTONE - LIMESAND

Mandurah Lakelands

REGION · Peel
01

Operation Details

Commodity
Limestone - Limesand
Region
Peel
District
South West M.F.
Latitude
-32.459089
Longitude
115.768872
02

Project Logistics & B2B Overview

Geographic Location and Topography

Mandurah Lakelands is situated within the Peel Region of Western Australia's South West Mining Field, a low-lying coastal plain characterised by shallow sandy soils, seasonal wetlands, and dense banksia-dominated scrubland. The terrain presents significant vegetation clearing constraints, with mandatory Dieback (Phytophthora cinnamomi) management protocols enforced across all access corridors and haul roads to prevent pathogen spread into adjacent conservation zones.

B2B Lifecycle and Operations

The site operates under an active extraction status, producing limestone and limesand commodities servicing regional construction, agriculture, and civil infrastructure markets. Continuous operations demand uninterrupted diesel fuel supply chains, with high-volume consumption across mobile plant fleets including excavators, front-end loaders, and articulated dump trucks. Dependency on regional power infrastructure or on-site generation substations is critical to sustain 24/7 processing continuity and site lighting compliance.

Engineering and Extraction Infrastructure

Limesand extraction typically involves hydraulic dredging or dry mechanical stripping, with processed material transferred via integrated conveyor systems linking extraction faces to screening, washing, and stockpile zones. Belt conveyor networks must be engineered to handle high-moisture, fine-grained limesand with anti-spillage skirting and dust suppression. Screening decks and wash plants represent critical capital assets requiring scheduled preventive maintenance contracts from qualified OEM or third-party mechanical service vendors.

ESG, Value Chain and Sustainability

Operations within the Peel Region are subject to rigorous DER and DWER regulatory oversight, mandating progressive land rehabilitation concurrent with extraction. While limesand operations generate minimal conventional tailings, wastewater and slurry management from wash plants requires engineered containment and decant systems. Proactive revegetation using endemic species, topsoil stockpile management, and Dieback hygiene protocols form the core of the site's environmental compliance and social licence framework.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Mandurah Lakelands.
Get listed