McLarty Range
Operation Details
Project Logistics & B2B Overview
Geographic Location and Topography
The McLarty Mine operates within the South West Metropolitan Fringe (South West M.F.) of Western Australia's Peel Region, a low-relief coastal plain characterised by sandy loams, wetland corridors, and seasonally high water tables. During intense winter rainfall events, haul road surfaces become critically compromised. Operators must implement geotextile-reinforced access roads and continuous mud management protocols — including gravel blinding layers and wheel wash stations — to maintain truck cycle times and prevent regulatory non-compliance under WA's Environmental Protection Act.
B2B Lifecycle and Operational Dynamics
As a fully operational quarry under Carbone Bros Pty Ltd (100% ownership), McLarty supplies construction aggregates to Perth's expanding southern corridor. B2B procurement cycles are driven by civil construction demand peaks. Logistical complexity includes:
- DIDO roster management for plant operators and maintenance crews from Perth metro
- Coordination of heavy haulage schedules with Peel region road authority permits
- Vendor qualification processes for crushing consumables and wear parts
- Seasonal production planning aligned with wet-season access constraints
Engineering and Extraction Infrastructure
McLarty's extraction circuit is consistent with Peel Region construction material operations. Key engineering components include:
- Primary jaw crushing stage for coarse aggregate reduction
- Secondary and tertiary cone crushing for graded product specification
- Wet screening and classification to meet AS 2758 aggregate standards
- Settling pond systems for process water recovery and fines management
- Stockpile management infrastructure for segregated product grades
High physical-chemical precision is required to deliver consistent particle size distribution to civil contractors.
ESG, Value Chain and Sustainability
Operating within the ecologically sensitive Peel Region demands rigorous ESG compliance. Key sustainability obligations include:
- Progressive rehabilitation and landform reconstruction per Mining Rehabilitation Fund (MRF) obligations
- Sediment and erosion control plans (SECP) active during all rainfall events
- Fines and slurry containment via engineered settling ponds — functionally analogous to tailings storage facilities
- Biodiversity offset management for Banksia woodland and wetland buffers
- Dust suppression programs compliant with DER air quality guidelines