REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · LIMESTONE - LIMESAND

Myalup Limestone

OPERATOR · MGM Bulk Pty Ltd / Ietto Farms Pty Ltd TYPE · Open Cut Quarry — Limestone and Limesand extraction REGION · South West
01

Operation Details

Operator
MGM Bulk Pty Ltd / Ietto Farms Pty Ltd
Commodity
Limestone - Limesand
Type
Open Cut Quarry — Limestone and Limesand extraction
Region
South West
District
South West M.F.
Latitude
-33.019543
Longitude
115.705461
02

Compliance & B2B Logistics

Access Logistics & DIDO

Road haulage via Finn Road, Myalup; regional access through South Western Highway corridor; DIDO operations from Harvey/Bunbury hub
03

Project Logistics & B2B Overview

Geographic Location and Topography

Finn Myalup is situated on Finn Road, Myalup, within the Shire of Harvey, South West Western Australia — Lots 1498, 1504, and 1794. The terrain is characterised by low-lying coastal plain with dense native Tuart and Banksia vegetation, demanding rigorous pre-clearance environmental assessments. Proximity to the Myalup-Wellington Dieback Management Zone mandates strict Phytophthora cinnamomi (Dieback) hygiene protocols for all plant, equipment, and personnel entering the operational footprint.

B2B Lifecycle and Operations

The operation functions as an active open-cut quarry under Operating status, extracting limestone and limesand for regional construction, agricultural lime, and civil infrastructure markets. Operational continuity relies on:

  • Diesel-intensive mobile fleet — excavators, front-end loaders, and articulated haul trucks burning continuous fuel cycles
  • Dependence on regional power infrastructure tied to Western Power's South West Interconnected System (SWIS)
  • DIDO workforce rotations sourced from Harvey, Bunbury, and Mandurah corridors
  • Haul road maintenance on Finn Road as a critical B2B logistics bottleneck

Extraction Engineering and Infrastructure

Limestone and limesand quarrying at Finn Myalup involves a primary crushing and screening circuit calibrated for carbonate-rich sedimentary material. Key engineering parameters include:

  • Jaw or impact primary crusher sizing for variable limestone hardness (UCS typically 10–40 MPa)
  • Wet or dry screening plants for limesand grading to specification
  • Dust suppression systems — critical given fine carbonate particulate generation
  • Geotechnical batter slope management in shallow unconsolidated coastal sediment profiles
  • No flotation circuit applicable — product separation achieved via mechanical screening

ESG, Value Chain and Sustainability

Operating within the South West's sensitive ecological corridor, Finn Myalup is subject to stringent progressive rehabilitation obligations under WA DMIRS and EPA frameworks. ESG compliance priorities include:

  • Void rehabilitation — progressive backfill, topsoil reinstatement, and native revegetation post-extraction
  • Dieback hygiene stations at all site access points — mandatory wash-down protocols
  • Stormwater and sediment runoff management to protect adjacent wetland buffers
  • No tailings facility required — waste material managed as overburden stockpile
  • Dust and noise monitoring aligned with Shire of Harvey development conditions
Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Myalup Limestone.
Get listed