REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · GOLD

Newhaven

OPERATOR · BML Ventures Pty Ltd TYPE · Open Pit (Newhaven Pit — Phillips Find Project) REGION · Goldfields-Esperance
01

Operation Details

Operator
BML Ventures Pty Ltd
Commodity
Gold
Type
Open Pit (Newhaven Pit — Phillips Find Project)
Region
Goldfields-Esperance
District
Kunanalling
Latitude
-30.612844
Longitude
120.965996
02

Project Logistics & B2B Overview

Geographic Location and Topography

The Newhaven Pit is situated within the Kunanalling district, Goldfields-Esperance Region, Western Australia — a semi-arid to arid landscape characterised by lateritic terrain, sparse vegetation, and extreme thermal amplitude. Annual rainfall averages below 300 mm, making water supply infrastructure a critical operational constraint. Bore-sourced or trucked water management protocols are non-negotiable for dust suppression, processing, and camp sustenance. Site accessibility relies on unsealed regional roads, demanding robust haul fleet maintenance schedules year-round.

B2B Lifecycle and Operations

BML Ventures Pty Ltd commenced operations at the Phillips Find Project — encompassing the Newhaven Pit — on 31 August 2024, classifying this asset as an early-stage operating mine. The B2B supply window is currently at its most acute: the operation requires local mechanical workshop support, mobile plant servicing, consumables supply chains, and earthworks contractors to prevent costly unplanned downtime. Vendors offering rapid-response field service within the Kalgoorlie–Coolgardie corridor hold a decisive competitive advantage at this lifecycle stage.

Engineering and Extraction Infrastructure

As an open pit gold operation, the Newhaven Pit likely employs conventional drill-and-blast followed by load-and-haul cycles feeding a primary crushing and milling circuit. Given the lateritic and saprolite gold mineralisation typical of the Kunanalling greenstone belt, processing may integrate:

  • Carbon-in-Leach (CIL) or heap leach circuits depending on ore grade and oxide depth
  • Primary jaw or gyratory crushing stages
  • SAG/ball mill grinding to target liberation size
  • Gravity concentration ahead of leach for coarse gold recovery

Reagent logistics — cyanide, lime, flocculants — require certified hazmat supply chains from Kalgoorlie.

ESG, Value Chain and Sustainability

As a junior operator, BML Ventures faces mounting pressure to align with ESG frameworks standard across Western Australian mining tenements. Key sustainability levers applicable to Newhaven include:

  • Diesel displacement via hybrid solar-storage microgrids to reduce Scope 1 emissions
  • Progressive rehabilitation bonding under DMIRS tenement conditions
  • Water recycling loops within the process plant to minimise bore extraction
  • Transition pathways toward light electric vehicles (LEVs) for site personnel movement

Early ESG integration reduces future compliance costs and strengthens offtake negotiation positioning.

Profile last updated · 26 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve Newhaven.
Get listed