GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)

Pattersons Hut Well

Stage: Operating
Last Updated: May 30, 2026

Operation Details

CommodityConstruction Materials
RegionPilbara
DistrictWest Pilbara M.F.
Latitude-20.814773
Longitude116.940798

Project Logistics & B2B Overview

Geographic Location and Topography

Pattersons Hut Well is situated within the West Pilbara Mining Field, Western Australia — a semi-arid, high-radiation terrain characterised by ironstone ridges, alluvial plains, and extreme diurnal temperature swings. Summer ambient temperatures routinely exceed 48°C, imposing critical thermal stress on hydraulic systems, conveyor drives, and diesel powertrains. Dust suppression and UV-resistant infrastructure coatings are non-negotiable operational requirements for any contracted equipment or service provider operating on-site.

B2B Lifecycle and Operations

The site holds Operating status within the Construction Materials commodity segment, indicating active extraction and likely supply into regional civil infrastructure projects. Operations in this classification typically run on continuous 24/7 production cycles, demanding uninterrupted diesel fuel logistics, on-site fuel storage compliance, and dedicated power substations or generator arrays. Vendor engagement windows are tied to project procurement cycles; no public operator or registered vendor portal has been identified for this location at this time.

Engineering and Extraction Infrastructure

Construction materials operations in the West Pilbara typically deploy primary crushing circuits — jaw or gyratory crushers — followed by screening and grading stages to produce road base, aggregate, and fill material. Unlike metalliferous operations, flotation circuits are not applicable here; however, dust control systems, wash plants, and compaction testing infrastructure are standard. Heavy machinery — including excavators, rigid dump trucks, and graders — requires heat-load management protocols: mandatory coolant system inspections, shaded servicing bays, and thermal shutdown thresholds enforced during peak-heat windows.

ESG, Value Chain and Sustainability

Operating in the Pilbara mandates rigorous Aboriginal Heritage compliance under the Aboriginal Heritage Act 1972 (WA) and alignment with Section 18 consent processes prior to any ground disturbance. B2B suppliers are increasingly required to demonstrate engagement with Registered Aboriginal Parties (RAPs) and preference for Indigenous-owned subcontractors in logistics, civil works, and environmental monitoring. ESG reporting obligations — including dust, noise, and groundwater impact assessments — are standard conditions of tenure for construction materials operations in this jurisdiction.

B2B SUPPLY CHAIN

EXPAND YOUR REACH TO
PATTERSONS HUT WELL

Connect directly with procurement managers in the Pilbara region.
Get your company listed and expand your operational footprint.

Get Listed for $65/mo