REGIONS INDEX  ·  10 REGIONS  ·  149 LIVE OPERATIONS ESC TO CLOSE
02 · MAP · WA
Schematic
KIMPILGASMWTGFEWHTMETPELSWTGTS
Regional Development Commission boundaries · DPIRD
SERVICES INDEX  ·  11 CATEGORIES  ·  5 GROUPS  ·  61 MINE-SITE PAGES ESC TO CLOSE
Can’t find what you need? Browse the full catalog or list your business in a new category. BROWSE ALL → GET LISTED →
MINE PROFILE · LIMESTONE - LIMESAND

WA Limestone

OPERATOR · PMR Quarries Pty Ltd (trading as WA Limestone) / Rocla Quarry Products Pty Ltd TYPE · Open-cut quarrying of limestone and limesand (surface extraction within state forest plantation leases) REGION · South West
01

Operation Details

Operator
PMR Quarries Pty Ltd (trading as WA Limestone) / Rocla Quarry Products Pty Ltd
Commodity
Limestone - Limesand
Type
Open-cut quarrying of limestone and limesand (surface extraction within state forest plantation leases)
Region
South West
District
South West M.F.
Latitude
-32.943298
Longitude
115.749319
02

Compliance & B2B Logistics

Access Logistics & DIDO

DIDO road-based access via South Western Highway; haul routes subject to seasonal wet-weather restrictions across Myalup State Forest tracks; no FIFO air roster confirmed
03

Project Logistics & B2B Overview

Geographic Location and Topography

The Myalup State Forest Limestone operation is situated approximately 8 km southeast of Lake Clifton within the South West region of Western Australia, embedded in a pine plantation managed as state forest. The terrain is characterised by low-relief coastal plain with sandy-loam overburden overlying oolitic limestone and limesand horizons. Intense seasonal rainfall across the Peel-Harvey catchment creates significant mud management challenges on unsealed forest access tracks, requiring regular grading and geotextile reinforcement to maintain haul truck trafficability year-round.

B2B Lifecycle and Operations

The project operates under mining leases M70/1319, M70/1320 (PMR Quarries / WA Limestone) and M70/1307 (Rocla Quarry Products), all at Operating status. Extraction targets construction-grade limestone and limesand for regional civil and agricultural markets. Operational workforce is sourced on DIDO rotating rosters from Mandurah and Bunbury corridors; no permanent camp infrastructure is confirmed, placing full dependency on local accommodation and daily road commute logistics, which amplifies fatigue-risk exposure during extended wet-season shifts.

Engineering and Extraction Infrastructure

Primary extraction employs drill-and-blast or rip-and-load methodology suited to soft-to-medium limestone. Crushed and screened material is transferred via mobile conveyor systems to stockpile zones within the lease boundary. Complex multi-stage conveyor configurations manage high-volume limesand throughput, minimising truck re-handle cycles. Dust suppression infrastructure — water carts and fixed sprinkler arrays — is critical given the fine-particle nature of limesand product fractions. Road-base and aggregate sizing is controlled through modular screening decks integrated into the conveyor circuit.

ESG, Value Chain and Sustainability

Operating within a state forest plantation imposes stringent environmental licence conditions under the WA Environmental Protection Act. Progressive rehabilitation is mandated post-extraction, including topsoil reinstatement and native understorey revegetation aligned with DWER requirements. While limesand extraction generates minimal coarse tailings, fine-fraction slurry management and sediment containment bunds are required to protect the Peel-Harvey wetland system. Proactive ESG reporting to the Department of Mines, Industry Regulation and Safety (DMIRS) underpins social licence continuity for both operating entities.

Profile last updated · 24 Jun 2026 · Verify operator and site details via Minedex before contracting.
Supplier?
Serve WA Limestone.
Get listed