GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)GOLD 2,350.50 USD/oz (+1.20%)COPPER 4.15 USD/lb (-0.45%)IRON ORE 43.20 AUD (BHP) (+0.10%)LITHIUM 3.80 AUD (PLS) (-2.10%)NICKEL 0.85 AUD (NIC) (+0.50%)RARE EARTH 6.20 AUD (LYC) (+1.50%)ALUMINA 1.45 AUD (AWC) (+0.00%)COAL 8.50 AUD (WHC) (-1.00%)

White Rock Quarry

Stage: Operating
Last Updated: May 30, 2026

Operation Details

CommodityDimension Stone
TypeDimension Stone (Open Cut Quarrying)
RegionPilbara
DistrictAshburton M.F.
Latitude-22.926735
Longitude115.702847

Project Logistics & B2B Overview

Geographic Location and Topography

White Rocks Quarry is situated within the Ashburton Municipal Shire, Pilbara Region, Western Australia — a geologically ancient landscape dominated by Precambrian basement formations. The terrain presents characteristically flat to undulating ironstone and sandstone plateaus, with ambient temperatures routinely exceeding 45°C during summer months. Thermal management protocols for heavy extraction machinery are operationally critical, requiring scheduled cool-down cycles, heat-shielded hydraulic systems, and continuous fluid temperature monitoring to prevent catastrophic drivetrain failure.

B2B Lifecycle and Operations

The site maintains Operating status, indicating active extraction and commercial dispatch of dimension stone product. Given the remote Ashburton location, workforce deployment relies entirely on FIFO rotational rosters, typically structured on 2:1 or 8:6 cycles. Camp infrastructure — including accommodation, catering, and medical support — constitutes a non-negotiable operational overhead. B2B contractors supplying consumables, fuel logistics, and camp services represent a structurally embedded supply chain dependency for sustained quarry productivity.

Engineering and Extraction Infrastructure

Dimension stone extraction at this scale demands precision diamond wire sawing and controlled blasting sequences to preserve block integrity and commercial grade. Material handling post-extraction relies on conveyor systems for transferring cut blocks and aggregate by-product across processing yards, minimising haul truck dependency and reducing operational cost-per-tonne. Conveyor infrastructure in Pilbara environments requires dust-sealed roller assemblies, UV-resistant belting, and automated tensioning systems to sustain throughput under extreme thermal and abrasive conditions.

ESG, Value Chain and Sustainability

As a dimension stone quarry, tailings generation is comparatively lower than metalliferous operations; however, slurry fines from cutting and polishing circuits require engineered containment within lined settling ponds. Proactive rehabilitation obligations under Western Australian DMP guidelines mandate progressive landform restoration, native seed propagation, and post-closure monitoring. ESG-aligned operators in this sector increasingly integrate water recycling circuits for cutting slurry, reducing freshwater drawdown — a critical metric given the water scarcity endemic to the Ashburton catchment.

B2B SUPPLY CHAIN

EXPAND YOUR REACH TO
WHITE ROCK QUARRY

Connect directly with procurement managers in the Pilbara region.
Get your company listed and expand your operational footprint.

Get Listed for $65/mo